DIGITAL TAKEOFFS
Measure, count and organize quantities from construction drawings, then connect them to your BOQ and estimation workflow.
Drawing → Measure → Quantity → BOQ → Estimate → Quote
PRE-CONSTRUCTION · DIGITAL TAKEOFF
TK-00126 · Al Barsha Heights Villas
Drawing A-101 · Ground floor plan · Rev 02
Takeoff items
+ Add itemConcrete
Area
310 m³
Steel
Linear
24,800 kg
Blockwork
Area
1,240 m²
Flooring
Area
580 m²
Painting
Area
1,850 m²
Doors
Count
24 Nos
Windows
Count
32 Nos
Each quantity stays linked to the drawing it was measured from
Connected measurement
Construction takeoffs often involve drawings, spreadsheets, handwritten calculations and separate BOQ files. Keeping quantities accurate and connected to the estimate can become difficult as projects change. Masarek brings the takeoff process closer to the BOQ and estimation workflow.
WITHOUT A CONNECTED WORKFLOW
WITH MASAREK
Drawings
Takeoff
Quantities
BOQ
Estimate
How digital takeoff works
STEP 01
Work from the project's construction drawings.
STEP 02
Measure lengths, areas and quantities directly from the drawing.
STEP 03
Group measurements against the relevant construction items.
STEP 04
Connect quantities with the BOQ and continue into cost estimation.
Measurement tools
Use construction-specific measurement tools to capture the quantities required for project estimating.
Measure lengths for walls, piping, cable runs and other linear work.
Calculate floor, wall, ceiling and other measurable areas.
Count doors, windows, fixtures, equipment and other repeated items.
Group measurements by item, work category or BOQ requirement.
Drawing-based takeoff
Keep measurements visually connected to the drawing so your team can review where quantities were taken from.
Selected takeoff item
Blockwork · 200mm external walls
Area measurement · Drawing A-101
1,240 m²
Takeoff summary
Sample interface values shown for illustration only.
Takeoff to estimate
01
Don't finish the takeoff and start the BOQ all over again. Organize measured quantities against the relevant BOQ items and carry them into estimation.
One measured quantity. One BOQ item. One connected record.
Drawing
A-101 · Rev 02
Takeoff item
Floor Tile
Quantity
580 m²
BOQ item
Floor Tile · 580 m²
Takeoff quantity 580 m² matches the BOQ quantity 580 m²
02
Use measured quantities as the foundation for your construction estimate, then apply your own rates and markup to reach a selling price.
Quantity into cost
Floor Tiles
580 m²
Unit cost
AED 88.00 / m²
Estimated cost
AED 51,040
Cost
AED 51,040
Markup
14%
Selling price
AED 58,186
Illustrative rates only — your own cost information is used in the product.
03
Construction drawings can change before work begins. Keep takeoff information organized so your estimating team can update quantities when project requirements change.
Revisions are updated by your team — nothing is compared automatically.
Revision trail
Drawing Revision 01
A-101 · 24 Aug 2026
Blockwork 1,180 m²
Takeoff
TK-00126 · V1
Blockwork 1,180 m²
Drawing Revision 02
A-101 · 08 Sep 2026
—
Updated Takeoff
TK-00126 · V2
Blockwork 1,240 m²
Updated BOQ
BOQ Rev 2
Blockwork 1,240 m²
Updated Estimate
ES-00184 Rev 2
AED 587,460
Built for construction
Whether you're pricing building works, fit-outs, MEP projects, civil works or renovation projects, Digital Takeoffs helps organize the quantities behind your estimate.
Measure the work, organize the quantities and estimate from one record.
Measure the work, organize the quantities and estimate from one record.
Measure the work, organize the quantities and estimate from one record.
Measure the work, organize the quantities and estimate from one record.
Measure the work, organize the quantities and estimate from one record.
Measure the work, organize the quantities and estimate from one record.
Measure the work, organize the quantities and estimate from one record.
Measure the work, organize the quantities and estimate from one record.
Pre-construction flow
Digital Takeoffs sits inside Masarek pre-construction, between the site visit and the cost estimate.
Lead Management
Site Visit
Digital Takeoffs
Cost Estimation
Schedule
Quote Management
Digital Signature
Project
Measure the work. Build the quantities. Estimate the cost. Prepare the quote.
Starts with Lead Management · continues into Estimation & Quoting · Masarek product · Pricing
Full lifecycle
Keep the quantities and commercial information connected as the project moves from pre-construction into execution.
Digital Takeoffs
BOQ
Cost Estimation
Quotation
Project
Procurement
Execution
Actual Cost
Invoice
Masarek does not stop at takeoff — the same record continues through procurement, execution and invoicing.
Key benefits
Keep measurements connected to the source drawing.
Keep takeoff quantities structured by construction item.
Move from measured quantities into the BOQ workflow.
Use quantities as the foundation for project costing.
Update takeoff information as project requirements change.
Continue from takeoff into estimation, quotation and project management.
Questions & answers
Digital takeoffs let you measure lengths, areas and counts directly from construction drawings and organise those quantities against the items you are pricing.
Yes. Measured quantities can be carried into the BOQ and estimate so the priced quantities match the drawing they came from.