DIGITAL TAKEOFFS

Turn drawings into quantities you can estimate

Measure, count and organize quantities from construction drawings, then connect them to your BOQ and estimation workflow.

Drawing → Measure → Quantity → BOQ → Estimate → Quote

PRE-CONSTRUCTION · DIGITAL TAKEOFF

TK-00126 · Al Barsha Heights Villas

Drawing A-101 · Ground floor plan · Rev 02

Send to BOQ
LinearAreaCountSelect 100% 1:100
42.60 m · LINEAR118.4 m² AREA12345COUNT · 5 NosSCALE 1:100GROUND FLOOR PLAN · A-101 · REV 02

Takeoff items

+ Add item
  • Concrete

    Area

    310 m³

  • Steel

    Linear

    24,800 kg

  • Blockwork

    Area

    1,240 m²

  • Flooring

    Area

    580 m²

  • Painting

    Area

    1,850 m²

  • Doors

    Count

    24 Nos

  • Windows

    Count

    32 Nos

Each quantity stays linked to the drawing it was measured from

Connected measurement

Stop measuring in one place and estimating in another.

Construction takeoffs often involve drawings, spreadsheets, handwritten calculations and separate BOQ files. Keeping quantities accurate and connected to the estimate can become difficult as projects change. Masarek brings the takeoff process closer to the BOQ and estimation workflow.

WITHOUT A CONNECTED WORKFLOW

Drawings
Manual measurements
Spreadsheets
Separate BOQ
Manual re-entry

WITH MASAREK

01

Drawings

02

Takeoff

03

Quantities

04

BOQ

05

Estimate

How digital takeoff works

From drawing to quantity

STEP 01

Open Your Drawing

Work from the project's construction drawings.

STEP 02

Measure & Count

Measure lengths, areas and quantities directly from the drawing.

STEP 03

Organize Quantities

Group measurements against the relevant construction items.

STEP 04

Use in Estimation

Connect quantities with the BOQ and continue into cost estimation.

DRAWING
MEASURE
QUANTITY
BOQ
ESTIMATE

Measurement tools

Measure the quantities that matter

Use construction-specific measurement tools to capture the quantities required for project estimating.

01

Linear Measurements

Measure lengths for walls, piping, cable runs and other linear work.

02

Area Measurements

Calculate floor, wall, ceiling and other measurable areas.

03

Count Items

Count doors, windows, fixtures, equipment and other repeated items.

04

Quantity Organization

Group measurements by item, work category or BOQ requirement.

Drawing-based takeoff

See where every quantity comes from.

Keep measurements visually connected to the drawing so your team can review where quantities were taken from.

A-101A-102A-201S-101Page 1 of 4
85%Scale 1:100
42.60 m · LINEAR118.4 m² AREA12345COUNT · 5 NosSCALE 1:100GROUND FLOOR PLAN · A-101 · REV 02

Selected takeoff item

Blockwork · 200mm external walls

Area measurement · Drawing A-101

1,240 m²

Takeoff summary

  • Blockwork1,240 m²
  • Floor Tiles580 m²
  • Painting1,850 m²
  • Doors24 Nos
  • Windows32 Nos

Sample interface values shown for illustration only.

Takeoff to estimate

Quantities that carry into your commercial workflow

01

Keep your takeoff connected to your BOQ

Don't finish the takeoff and start the BOQ all over again. Organize measured quantities against the relevant BOQ items and carry them into estimation.

One measured quantity. One BOQ item. One connected record.

01

Drawing

A-101 · Rev 02

02

Takeoff item

Floor Tile

03

Quantity

580 m²

04

BOQ item

Floor Tile · 580 m²

Takeoff quantity 580 m² matches the BOQ quantity 580 m²

COST ESTIMATION

02

Take quantities straight into estimating

Use measured quantities as the foundation for your construction estimate, then apply your own rates and markup to reach a selling price.

Quantity into cost

Floor Tiles

580 m²

Unit cost

AED 88.00 / m²

Estimated cost

AED 51,040

Cost

AED 51,040

Markup

14%

Selling price

AED 58,186

Illustrative rates only — your own cost information is used in the product.

03

Keep up when drawings change

Construction drawings can change before work begins. Keep takeoff information organized so your estimating team can update quantities when project requirements change.

Revisions are updated by your team — nothing is compared automatically.

Revision trail

Drawing Revision 01

A-101 · 24 Aug 2026

Blockwork 1,180 m²

Takeoff

TK-00126 · V1

Blockwork 1,180 m²

Drawing Revision 02

A-101 · 08 Sep 2026

—

Updated Takeoff

TK-00126 · V2

Blockwork 1,240 m²

Updated BOQ

BOQ Rev 2

Blockwork 1,240 m²

Updated Estimate

ES-00184 Rev 2

AED 587,460

Built for construction

Built for the way construction is measured

Whether you're pricing building works, fit-outs, MEP projects, civil works or renovation projects, Digital Takeoffs helps organize the quantities behind your estimate.

01

General Contractors

Measure the work, organize the quantities and estimate from one record.

02

Subcontractors

Measure the work, organize the quantities and estimate from one record.

03

MEP Contractors

Measure the work, organize the quantities and estimate from one record.

04

Fit-Out Companies

Measure the work, organize the quantities and estimate from one record.

05

Civil Contractors

Measure the work, organize the quantities and estimate from one record.

06

EPC Contractors

Measure the work, organize the quantities and estimate from one record.

07

Infrastructure Contractors

Measure the work, organize the quantities and estimate from one record.

08

Renovation & Remodeling

Measure the work, organize the quantities and estimate from one record.

Pre-construction flow

One connected path from opportunity to quote

Digital Takeoffs sits inside Masarek pre-construction, between the site visit and the cost estimate.

01

Lead Management

02

Site Visit

03

Digital Takeoffs

04

Cost Estimation

05

Schedule

06

Quote Management

07

Digital Signature

08

Project

Measure the work. Build the quantities. Estimate the cost. Prepare the quote.

Starts with Lead Management · continues into Estimation & Quoting · Masarek product · Pricing

Full lifecycle

From drawing to invoice

Keep the quantities and commercial information connected as the project moves from pre-construction into execution.

01

Digital Takeoffs

02

BOQ

03

Cost Estimation

04

Quotation

05

Project

06

Procurement

07

Execution

08

Actual Cost

09

Invoice

Masarek does not stop at takeoff — the same record continues through procurement, execution and invoicing.

Key benefits

Less manual work. More connected information.

01

Work From Drawings

Keep measurements connected to the source drawing.

02

Organize Quantities

Keep takeoff quantities structured by construction item.

03

Connect to BOQ

Move from measured quantities into the BOQ workflow.

04

Estimate From Quantities

Use quantities as the foundation for project costing.

05

Handle Revisions

Update takeoff information as project requirements change.

06

Stay Connected

Continue from takeoff into estimation, quotation and project management.

Questions & answers

Frequently asked questions

What are digital takeoffs in Masarek?

Digital takeoffs let you measure lengths, areas and counts directly from construction drawings and organise those quantities against the items you are pricing.

Do takeoff quantities feed the estimate?

Yes. Measured quantities can be carried into the BOQ and estimate so the priced quantities match the drawing they came from.

READY TO ESTIMATE?

Turn your drawings into a clearer estimating workflow.

Bring takeoff, quantities, BOQ and construction estimation into one connected workflow with Masarek.